Latest job knock thro, steel in tiles lifted floor tanked and then self level to protect the tanking.
![](https://www.paulsplastering.co.uk/wp-content/uploads/2020/05/83255382_2644957038922093_3042725432882364416_n-540x400.jpg)
New extension concrete floor layed. Walls insulated and skimmed. Looking to have a new concrete floor layed or your room insulated and skimmed give us a call for a free quote.
Check out this video below: